Significant accomplishments

  • 2016 6000 msw Bathysaurus XL ROV delivered to customer
  • 2016 1000 msw Mariner ROV system delivered to KB Dykk AS, KB Troll
  • 2016 1000 msw Mariner ROV system delivered to KB Dykk AS, KB Rørvik
  • 2016 1000 msw Mariner ROV System delivered to KB Dykk AS, KB Nordland
  • 2016 1000 msw Rover ROV system delivered to FSV AS
  • 2016 1000 msw Bathysaurus complete rebuild for FMV
  • 2015 3000 msw Mariner XL ROV system delivered to Mohn Drilling
  • 2015 1500msw Rover ROV system delivered to SAMBA AS
  • 2015 1500msw Rover ROV system delivered to ROV AS 
  • 2015 1500msw Mariner ROV system delivered to KB Dykk AS, KB Holmtun
  • 2015 1500msw Rover ROV system delivered to FSV AS
  • 2014 3000 Mariner XL seismic delivered to Gate
  • 2014 3000 msw Mariner XL delivered to Gate
  • 2014 ROV operations in the North sea for Exxon Mobile
  • 2014 Cruise to Jan Mayen with Bergen University's Institute of Geobiology
  • 2013 6000msw Bathysaurus XL WROW system delivered to Swire Seabed
  • 2012 Mariner XXL WROV delivered to PG
  • 2012 Estlink cable laying Nexans Norway
  • 2012 Joint RSV operations with Libas for Shell (Ormen Lange), CGG (seismic support) and ExxonMobil (FPSO inspection)
  • 2011 Re-grouting and internal tank inspection method development and pilot project for Noreco
  • 2010 Riser stabilisation for AGR
  • 2010 Valhall Re-development #2 Pre-lay Survey, debris removal, cable laying and trenching for Nexans Norway
  • 2009 Cruise to Jan Mayen with Bergen University's Institute of Geobiology
  • 2009 Valhall Re-development Pre-lay Survey and cable/debris removal, cable laying and trenching for Nexans Norway
  • 2009 Hainan Guangdong Cable Laying and Trenching for Nexans Norway
  • 2008 Marine EM pulse source developed
  • 2008 Pollution survey in Drammen fjord to open for development of a new suburb
  • 2008 Survey and service at “Geostar", the first real-time subsea observatory, 2000m deep
  • 2008 Cable survey and detection for Fugro (Libya)
  • 2007 Bathysaurus XL work class ROV
  • 2007 Cable tracking for Statnett using ROV with TSS 350
  • 2007 Contributed to the survey of the “Prestige” at 3850m for Fugro and the Spanish Government
  • 2007 Installed a suction anchor 1200m at Goliat
  • 2006 Gravimetric studies for Statoil
  • 2006 Installed a power cable at Dolphin
  • 2005 Repaired the Fennoscan cable in Finland
  • 2005 Guided cable lay across the Gibraltar strait with simultaneous post-lay survey
  • 2004-2008 Research for The University of Bergen, Marine and Geophysical Departments
  • 2004 Delivered an Argus Mariner to Assodivers in Greece.
  • 2004 Built an Argus Abyss ROV for depths down to 6000metres.
  • 2003 Developed DPV for the Norwegian Special command
  • 2002 Delivered 4 Argus Rover MKII ROV-systems for the Swedish navy. 2 of them incl. TMS/Garage with bailing arm system.
  • 2001 Delivered an Argus Mariner XL to Nexans Norway. The vehicle has the performance of a work class ROV and it is all electric.
  • 2001 Delivered an Argus Rover mkII observation ROV to Atlantic Diving.
  • 2001 Delivered an Argus Mariner OBS/WORK class ROV with a survey package to Artec Subsea.
  •